At MT and Sons Construction, we’re committed to delivering competitive Subgrade bids and reliable, on-time scheduling to keep your project moving forward. Explore our full list of services below and let us be your trusted partner on your next construction project.
Experienced
Reliable
Punctual
Grade / Stabilization / Base
- Minor Grading: MT and Sons can Grade Small to Medium Size projects to +/- 0.10’ to allow for proper drainage.
- Crushed Concrete Flex Base: Install Crushed Concrete Flex Base as needed per project – Water and Compact.
- Scarify and Compact: Scarify is typically done to a depth of 6”. It can be Dry or Moisture Conditioning and is typically compacted to a 95% of the Standard Proctor Density.
- Slab Moister Conditioning: Slab Moister Conditioning is typically excavated to a depth of 6-8’. Water and compacted in lifts of 6” – With the top 12” installed with a Crushed Concrete Flex Base Cap. Excess spoils to be hauled off or respread onsite.
- Cement Stabilization: The Standard Cement Stabilization will be done to a depth of 6”. Then mix 6-8% of Cement Slurry into the subgrade and fine graded.
- Lime Stabilization: The Standard Cement Stabilization will be done to a depth of 6”. Then mix 6-8% of Lime Slurry into the subgrade and fine graded.
- ADA Signage and Line Striping: Will be installed by standard city codes.